HEATHROW AIRPORT,
TERMINAL 3, CHECK IN REFURBISHMENT
Heathrow Airport owner BAA has recently provided the new
terminal 5 (T5) for British Airways. As a result of this
the other airlines are being provided with refurbished
spaces within Terminals 1, 3 & 4. Part of the huge
programme of work is the refurbishment of Terminal 3
check in area.

Client:
Morgan Professional Services
Architect:
Pascal + Watson
Main Contractor:
Morgan Ashurst
Energi Consulting Services Ltd
provided lighting design and
electrical design services to MPS. Using our lighting
design expertise we were able to model an area of the
check in space using our 3D visualisation lighting
design software. We were able to provide predicted lux
levels likely to be achieved by the normal mains
lighting and the emergency lighting.

The 3D visualisation
which you can move around in real time, enables you to
walk through spaces to get a feel for the overall effect
likely to be achieved from a lighting scheme. This has
benefits for the whole design team and the client. You
can see at the design stage, any hot spots and areas of
poor uniformity.
We were also able to
provide energy efficiency calculations in accordance
with ADL2 of the 2006 building regulations.
|